MUMUTH by UNStudio

0 comments

 

unstudio_graz_sq1

MUMUTH, the Haus für Musik und Musiktheater in Graz, Austria, designed by UNStudio, opens on 1 March.

unstudio_graz_stairs_sq

The theatre, part of the University of Music and Performing Arts Graz (KUG), can seat up to 450 people.

MUMUTH by UNStudio

Photos are by Christian Richters.

MUMUTH by UNStudio

The design evolved from ideas of a coiled “spring structure”

supporting the building and enveloping the various elements. 

graz_sketch

 
Below is a press release, project text and credit list from the architects:

Press Release UNStudio / KUG
Opening MUMUTH - Haus für Musik und Musiktheater, Graz

 The MUMUTH - Haus für Musik und Musiktheater, a faculty building for the University of Music and Performing Arts Graz (KUG), has been ten years in the making, including two years of construction and will be officially opened on March 1st 2009. To celebrate this special event the Institute for Music Drama will present a performance of W.A. Mozart’s opera “The Magic Flute”, just before a “Celebration for Otto Kolleritsch”

, Rector emeritus of KUG and a longstanding supporter of MUMUTH, will take place.

graz_structure_line

Since 1963 MUMUTH represents a central practice and event building for the KUG. “Finally we can offer our students an outstanding architectural building space to further their artistic training. The mission of the Arts University is the on-going development of the arts. Thanks to MUMUTH our audience can be increasingly involved in this exciting process”

, says Rector KUG Georg Schulz.

graz_structure

The new Music Theatre, designed by Ben van Berkel of the renowned Dutch architecture firm UNStudio following an international competition with 212 entries, has already formed the Austrian contribution to the Venice Biennale of Architecture.

graz_transparent-section

Of the design of MUMUTH Architect Ben van Berkel says: “The desire to make a building that is as much about music as a building can be, has been a constant throughout the nearly ten years that it took to build the theatre and the themes that are at the basis of the building and its overall organization have also endured throughout this time.”

MUMUTH by UNStudio

Construction of the 19 million euro new music theatre began in March 2006 and in August 2008 the Federal Real Estate Society (BIG) entrusted the main part of the building to the KUG. In February 2009 the MUMUTH also hosted part of the 7th International Competition “Franz Schubert and Modern Music”

.

Upcoming events in MUMUTH include W.A. Mozart’s “The Magic Flute” (3rd, 5th and 7th March) and on April 2nd the new abo@MUMUTH starts with a staging of the “St. John Passion BWV 245”

, the stage set for which has also been designed by Ben van Berkel/UNStudio (further performances: 4th, 6th and 8th of April).

http://www.dezeen.com/2009/02/19/mumuth-by-unstudio/

Trend Research From PSFK

Inspiration to make things better!

Subscribe to News

Preview Newsletter

Leave a Comment